When loads get too big for forklifts and too precise for rough handling, teams turn to overhead cranes. This long-form walkthrough takes you behind the scenes of a mega-project crane install. You’ll see preparation and surveys—with the same checklists pro installers use.
Bridge Crane Basics
At heart, a bridge crane is a bridge beam that spans between two runway beams, with a trolley that travels left-right along the bridge and a hoist that lifts the load. The result is smooth X-Y-Z motion: cross-travel along the bridge.
They’re the backbone of heavy shops and assembly lines, from beam handling to turbine assembly.
Why they matter:
Safe handling of very heavy, unwieldy loads.
Less manual handling, fewer delays.
Lower risk during rigging, lifting, and transport inside facilities.
High throughput with fewer ground obstructions.
System Components We’re Installing
Runways & rails: runway girders with crane rail and clips.
End trucks: wheel assemblies that ride the rail.
Bridge girder(s): cambered and pre-wired.
Trolley & hoist: cross-travel carriage with lifting unit.
Electrics & controls: power supply, festoon or conductor bars.
Stops, bumpers & safety: overload protection, e-stops.
Based on design loads and bay geometry, you may be dealing with modest shop lifts or major industrial picks. The installation flow stays similar, with heavier rigs demanding extra controls and sign-offs.
Before the First Bolt
A clean install is mostly planning. Key steps:
Drawings & submittals: Freeze the GA and verify reactions with the structural team.
Permits/JSAs: Job Safety Analysis (JSA) for each lift step.
Runway verification: Check baseplates, grout pads, and anchor torque.
Power readiness: Lockout/tagout plan for energization.
Staging & laydown: Lay out slings, shackles, spreader bars, and chokers per rigging plan.
People & roles: Brief everyone on radio calls and stop-work authority.
Millimeters at the runway become centimeters at full span. Spend time here.
Getting the Path Right
If rails are off, nothing else will run true. Targets and checks:
Straightness & elevation: shim packs under clips to meet tolerance.
Gauge (span) & squareness: Check centerlines at intervals; confirm end squareness and expansion joints.
End stops & buffers: Verify clearances for bumpers at both ends.
Conductor system: Keep dropper spacing uniform; ensure collector shoe reach.
Log final numbers on the ITP sheet. Correct now or pay later in wheel wear and motor overloads.
Putting the Span in the Air
Rigging plan: Softeners protect painted flanges. Dedicated signaler on radio.
Sequence:
Install end trucks at staging height to simplify bridge pick.
Rig the bridge girder(s) and make the main lift.
Use drift pins to align flange holes; torque to spec.
Verify camber and bridge square.
Prior to trolley install, bump-test long-travel motors with icf walls temporary power (under permit): confirm limit switch wiring. Re-apply LOTO once checks pass.
The Heart of the Lift
Trolley installation: Hoist/trolley arrives pre-assembled or as modules.
Hoist reeving: Check rope path, sheave guards, and equalizer sheaves.
Limits & load devices: Check overload/SLI and emergency stop.
Cross-travel adjustment: Verify end stops and bumpers.
Pendant/remote: Install pendant festoon or pair radio receiver; function-test deadman and two-step speed controls.
Grinding noises mean something’s off—stop and inspect. Fix the mechanics first.
Electrics & Controls
Power supply: Drop leads tagged and strain-relieved.
Drive setup: Enable S-curve profiles for precise positioning.
Interlocks & safety: Zone limits near doors or mezzanines.
Cable management: Secure junction boxes; label everything for maintenance.
Commissioning crews love clean labeling and clear folders. Photos of terminations help later troubleshooting.
Trust but Verify
Inspection Test Plan (ITP): Third-party witness for critical steps.
Torque logs: Re-check after 24 hours if required.
Level & gauge reports: Attach survey prints.
Motor rotation & phasing: Document bump tests.
Functional tests: Anti-collisions and zone interlocks.
A tidy databook speeds client acceptance.
Proving the System
Static load test: Apply test weights at the hook (usually 100–125% of rated capacity per spec).
Dynamic load test: Check sway, braking distances, and VFD fault logs.
Operational checks: Emergency stop shuts down all motions.
Training & handover: Maintenance intervals for rope, brakes, and gearboxes.
When the logbook is clean, the crane is officially in service.
Where These Cranes Shine
Construction & steel erection: placing beams, trusses, and precast.
Oil & gas & power: generator and turbine assembly.
Steel mills & foundries: hot metal handling (with the right duty class).
Warehousing & logistics: bulk material moves with minimal floor traffic.
Once teams learn the motions, cycle times drop and safety improves.
Safety & Engineering Considerations
Rigging discipline: dedicated signaler and stop-work authority.
Lockout/Tagout: test before touch every time.
Fall protection & edges: scissor lifts and manlifts inspected.
Runway integrity: no cracked welds, correct bolt grades, proper grout.
Duty class selection: overspec when uncertainty exists.
Safety isn’t a stage—it's the whole show.
Keep It Rolling
Crab angle/drift: verify end-truck wheel diameters and gearbox mounts.
Hot gearboxes: misalignment or over-tight brakes.
Rope drum spooling: check fleet angle and sheave alignment.
Pendant lag or dropout: antenna placement for radio; inspect festoon collectors.
Wheel wear & rail pitting: lubrication and alignment issues.
A 10-minute weekly check saves days of downtime later.
FAQ Snippets
Overhead vs. gantry? Bridge cranes ride fixed runways; gantries walk on the floor.
Single vs. double girder? Span and duty class usually decide.
How long does install take? Scope, bay readiness, and tonnage rule the schedule.
What’s the duty class? FEM/ISO or CMAA classes define cycles and service—don’t guess; size it right.
What You’ll Take Away
Students and pros alike get a front-row seat to precision rigging, structural alignment, and commissioning. You’ll gain a checklist mindset that keeps cranes safe and productive.
Need a field bundle with JSA templates, rigging calculators, and commissioning sheets?
Grab the installer pack and cut hours from setup while boosting safety and QA/QC. Bookmark this guide and share it with your crew.
...
Read more arabic articles...
read more about this products